"...two 300' x 100' barges, each equipped with GE 7FA turbines, that have a combined power generating capacity in excess of 340 MW of electricity. [...] launched in 180 days. Waller Marine designed and managed the construction of the barges, along with the installation of the power plants on the barges, utilizing over 900 men working in shifts, 7 days a week, 24 hours a day. This video shows the highlights and progress of the construction, the launch of the barges and their subsequent movement by tug and heavy lift vessel."FYI, here's inside of the GE 7FA's...
Exponential Innovations Everywhere
* * *
Joost Bonsen's Opinions on How Money, Ideas, and Talent can
Enable Health, Wealth, and Happyness for Each plus Achieve Liberty, Prosperity, and Vitality for All and Ultimately Help Us Spread Beyond Our Cradle Planet Earth
12 March 2012
Floating Utilities ~ Waller Marine's Power Barges
Very interesting to see these Waller Marine-built power barges...